PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Erecting stone panels at the 4th floor East Elevation.jpg Erecting the stone panels at the East Elevation UCIA Roof 1.jpg Erecting the stone panels at the North Elevation UCIA Roof 5.jpg Installing wood blocking along the high roof parapet Facing West.jpg Erecting the stone panels at the North Elevation UCIA Roof 3.jpg Installing motorized dampers at the 2nd floor Facing North.jpg Installing sprinkler piping at the 2nd floor Facing South.jpg Installing storm at the High Roof Facing East.jpg Interior Electrical roughing at the 2nd floor Facing North.jpg
Previous pageNext page Erecting the stone panels at the North Elevation UCIA Roof 3
Erecting the stone panels at the North Elevation UCIA Roof 3